Home › Elevators/Lifts › Remodeling

Remodeling

We offer consultation on replacing (remodeling) old freight and car elevators.

20 projectsRemodeling track record (2022~2025)
15~20%Installation cost compared with roped elevators (advantage of hydraulic elevators)
No structural reinforcement neededReview of the upper structure of old buildings (advantage of hydraulic elevators)

When to replace — replacement intervals by part

PartReplacement interval
Drive unit (complete assembly with all components)20 years
Hydraulic power unit and its accessories10 years
Rupture valve10 years
Flow restrictor6 years
Control panel (complete assembly with all components)15 years
Power conversion devices such as inverters6 years
Unintended Car Movement Protection (UCMP)6 years
Overspeed governor8 years
Door (refers to the complete assembly with all components)10 years
Door operator3 years
Door closing safety device5 years
Emergency call device5 years
Note on part replacement intervalsThe replacement intervals given above apply to typical conditions (environment). If the frequency of use is excessively high or the surrounding environment is harsh, the service life of parts may be shorter.

Advantages of the hydraulic type for existing buildings

  • Installation cost is about 15–20% lower than roped elevators, and maintenance cost is very low.
  • Installing a roped elevator requires considerable cost and time for structural reinforcement at the top. Especially in older buildings, the safety of the upper structure must be reviewed, but hydraulic elevators do not require this.
  • When a building is extended, hydraulic elevators can be installed more easily than roped elevators, without structural reinforcement.
  • Because hydraulic elevators do not use a counterweight, they save about 12% of the hoistway area.
  • The machine room can be located freely to suit the building's structure and use.
  • Installation period: shorter than for roped elevators.

Source: Advantages of Hydraulic Elevators

Remodeling Track Record

YearSiteUse / Load (floors served)Speed
2025천혜빌딩(경기 안산시)Car 2.5 t (3 floors served)16m/min
2024쌍용프라자(서울 송파구)Car 3.0 t (3 floors served)20m/min
2024(주)텔레트론(경기 안양시)Car 3.0 t (3 floors served)20m/min
2024대구오페라하우스(대구 북구)Freight 3.0 t (2 floors served)19m/min
2024청원빌딩(서울 강남구)Car 3.0 t (2 floors served)19m/min
2024(주)다농(전북 전주시)Freight 3.0 t (4 floors served)18m/min
2024서경백화점(인천 서해구)Car 3.0 t (2 floors served)19m/min
2024두암빌딩(서울 송파구)Car 2.0 t (3 floors served), 2 units15m/min
2024한국다이요잉크(주)(경기 안산시)Freight 5.0 t (4 floors served)26m/min
2024신월4동민자유치주차장(서울 양천구)Car 2.5 t (3 floors served), 2 units19m/min
2024한림수협(제주 제주시)Freight 5.0 t (2 floors served)20m/min
2024동익프라자(충북 청주시)Car 2.5 t (3 floors served)19m/min
2024자연그대로(경기 양주시)Freight 3.0 t (4 floors served)20m/min
2023우리은행일산중앙금융센터(경기 고양시)Car 2.5 t (3 floors served)19m/min
2023관보쇼핑센타(경기 성남시)Car 3.0 t (3 floors served), 2 units30m/min
2023서초안빌딩(서울 서초구)Car 3.0 t (2 floors served)18m/min
2023선산우체국(경북 구미시)Freight 1.0 t (2 floors served)20m/min
2022금영빌딩Car 2.0 t (3F/2S single entrance)20m/min
2022백조식관(서산)Car 2.0 t (2F/2S Z-through)m/min
2022세일빌딩(상계동)Car 2.5 t ( through)18m/min

The full track record is available in Projects.

Remodeling Consultation

Let us know the rated load (tons/kg), number of floors, speed, and whether it is new or remodeling, and we will respond promptly.